Wednesday, October 13, 2010

2007-2009 provincial agricultural Xi County

 Comprehensive Development

inspection reports completed projects in Shanxi Province, southwest of Xi County, Linfen City, northwest edge of a large anticline axis Luliangshan Department, across the longitude 110 ° 55'-111 ° 15 ', latitude 36 ° 30'-36 ° 55'. Fenxi east, west, Yonghe, South and Pu County, Daning bordering the north and the stone floor, near the intersection of east-west width of 45 km, 52 km north to south, with a total area of 1415.3 square kilometers, 31 million mu of arable land to corn and small grains dominated, pome area of 20 hectares, rich apple, pear, unique taste, high quality, the Ministry of Agriculture named the By a county population of 10 million, of which 2 million people in the urban population, agricultural population of 8 million people, per capita income lower, is the key counties for national poverty alleviation and development.

Xi County, convenient transportation and highways. 209 State Road, north to south, Shanxi Provincial Fen (West) Wing (and) line crosses the things, the ruins of Xi county Loess Plateau. Defects within the wall surface of high-wide, ravines criss-cross, rolling hills, hilly. There are three main county of Sichuan, seven wall, eight trenches, soil erosion area of 1172.7 square kilometers, the terrain of the northeast, southwest of the low. Most elevation of 950-1300 m between the highest point of the town of Zijingshan 1955 m of loess, the lowest afternoon city urban village of 770 meters on the HU. A warm temperate continental monsoon climate, annual average temperature 9.5 ℃, annual average precipitation 450--550 毫米,

average 2740.9 hours of sunshine, frost-free period on average 150--160 days. Every year, different degrees of drought, flood, wind, hail, frost and other natural disasters, particularly drought is more serious.

agricultural based Pro [2007] 61, [2008] 41 and [2009] No. 47 approved documents, Xi County 2007 - 2009 Provincial comprehensive agricultural development project 3 project land management projects, homeland in 2007, respectively, comprehensive ecological project, in 2008 Wei Jia Yu comprehensive ecological project, in 2009 Dongchuan River comprehensive treatment project ecology of loess covering two townships four village committee (afternoon town homeland, Wei Jia Yu , water embankment village committee and village committee loess loess town) 0.62 million, the agricultural labor force 3535, plans a total investment of 13,453,800 yuan.

agricultural development in the provinces to do the strong support of the county, the county government under the correct leadership, in collaboration with the relevant functional departments, the cadres and the masses through the project area and the project construction unit of the joint efforts So far, the engineering tasks have been completed, and achieved significant benefits.

First, organize the work of completion of project acceptance

Provincial Agricultural Development under the Office notice County 2007 - 2009 Provincial comprehensive agricultural development project to undertake a comprehensive completion of the development of policies, various systems, construction standards, and through the skin of the project plan and preliminary design, implementation of each project, and inspected each fund, read each file to solid work, ready to meet the higher level of inspection and acceptance .

II and completion of the project plans to invest

Xi County three years to complete the total project investment of 13.5637 million yuan (including supervision costs 120,000 yuan), accounting for 13.4538 million yuan to 100.82 percent plan; which Province completed 7.581 million yuan of financial funds, accounting for 7.6 million yuan for 99.75% planning, municipal finance matching funds completed 38 million, representing 100% of plan, the county treasury with funds to complete 1.90 million, accounting for 100% of planned, self-financing completion of 3.7027 million yuan, accounting for 3,573,800 yuan of 103.61 percent plan. Where:

2007 年 homeland comprehensive ecological 3.6901 million yuan investment project is completed (including supervision fee 40,000 yuan), the planned 3,673,800 yuan of 100.44 percent, which the provincial government funds to complete 1,994,400 yuan, accounting for program 200 million of 99.72%, municipal finance matching funds to complete the 10 million, representing 100% of plan, the county treasury with funds to complete 50 million, accounting for 100% of planned, self-financing the completion 1.0957 million yuan, accounting for 1,073,800 yuan plans of 102.04%. Wei Jia Yu

2008 年 comprehensive ecological 4.8041 million yuan investment project is completed, the planned 4.68 million of 102.65 percent, which the provincial government funds to complete 2,619,400 yuan, accounting for 2.6 million yuan of 100.75 percent plan, the city Financial matching funds completed 13 million, representing 100% of plan, the county finance with capital of 65 million, representing 100% of planned, self-financing the completion 1.4047 million yuan, accounting for 1.3 million yuan to 108.06 percent plan.

2009 年 Dongchuan River comprehensive management project is completed loess ecological investment 5,069,500 yuan, the planned 5.1 million yuan for 99.40%, of which 2.9672 million yuan to complete the provincial financial resources, accounting for 98.91% 300 million plan, the city Financial matching funds completed 15 million, representing 100% of plan, the county financial matching funds, 75 million, representing 100% of planned, self-financing the completion 1.2023 million yuan, accounting for 120 million plan of 100.19%.

Third, project tasks, action plans and completion of projects

three years, the county completed a total area of 1.51 million mu of ecological comprehensive management, accounting program 100%. Where: Water measures: Block 1 New Gate Dam, completed the program 100%; new irrigation and drainage stations 3, 100% completed the program; laying pipes 9.0 km, 100% completed the program; canal 1.1 km, 100% completed the program ; new reservoir three to complete the project 100%; new dam five, 100% completed the program; lose change line circuit 1.25 km, 100% completed the program; stream revetment 0.62 km, 100% completed the program; Block 1 small storage drainage works, to complete the planned 100%; Small Structures in Block 1, to complete the planned 100%. Agricultural practices: soil improvement of 0.25 acres, 100% completed the program; renovated tractor road 12.9 km (of which 5.2 km mud stone road completed), completed the program, 10.9 km of 118.35%; completed 79.8 km ridge ladder to complete the project 100%. Forestry measures: water conservation forest to create 1.19 acres, 100% completed the program; forest 0.06 acres, 100% completed the program; 11.2 km roadside tree planting to complete the planned 9.2 km of 121.74%. Science and technology promotion measures: technical training 03,300 people to complete the project 100%; demonstration and extension of 0.1 acres, 100% completed the program. Work and other measures: the management costs 263,000 yuan, 316,900 yuan for the planned 82.99%; management and protection costs 38,600 yuan, 18,000 yuan expenditure during the year, the remaining funds under the management and protection sub-annual payment of the situation.

including:

2007 年 homeland comprehensive ecological project is completed comprehensive ecological area of 0.45 million mu, accounting for 100% of plan. Where: Water measures: Block 1 New Gate Dam, completed the program 100%; new irrigation and drainage station 2, the completion of the planned 100%; laying pipes 7.3 km, 100% completed the program; new reservoir 2, the completion of the planned 100 %; 1.0 km power transmission line, completed the program 100%; new dam five to complete the project 100%. Agricultural practices: soil improvement (machine terracing) 0.06 acres, 100% completed the program; renovated tractor road 6 km, 4 km from the planned 150%; completed 44.8 km ridge ladder to complete the project 100%. Forestry measures: water conservation forest to create 0.32 acres, 100% completed the program; forest 0.06 acres, 100% completed the program; roadside planting 6.0 km, 4.0 km of the planned 150%. Science and technology promotion measures: technical training 00,900 people to complete the project 100%; demonstration and extension of 0.04 acres, 100% completed the program. Work and other measures: the management costs 65,000 yuan to complete the project 100%. Wei Jia Yu

2008 年 comprehensive ecological project is completed comprehensive ecological area 0.52 million mu, accounting for 100% of plan. Where: Water measures: New irrigation and drainage stations, Tower 1, 100% completed the program; buried pipeline is 1.7 km in completion of the planned 100%; canal 1.4 km 1.1 km completed the program, 127.27%; new reservoir Block 1, to complete the planned 100%; lose change line circuit 0.25 km, 100% completed the program; new small storage drainage Block 1, to complete the planned 100%. Agricultural practices: soil improvement (machine terracing) 0.05 acres, 100% completed the program; renovated tractor Road, 4.9 km (one way to complete 3.2 km mud stone), to complete the planned 100%; complete ladder 35.0 km, 100% completed the program . Forestry measures: water conservation forest to create 0.47 acres, 100% completed the program; roadside planting 3.2 km, 100% completed the program. Science and technology promotion measures: technical training 01,UGG boots clearance,300 people to complete the project 100%; demonstration and extension of 0.03 acres, 100% completed the program. Work and other measures: the management costs 80,000 yuan, 116,800 yuan for the planned 68.49%.

2009 年 Dongchuan River comprehensive management project is completed loess eco eco comprehensive area 0.54 million mu, accounting for 100% of plan. Where: Water measures: stream bank revetment 0.62 km, 100% completed the program; Small Structures in Block 1,UGGs, to complete the planned 100%. Agricultural practices: soil improvement of 0.14 million mu (0.01 million mu of which machine terracing), 100% completed the program; renovated tractor Road, 2.0 km, all the mud stone road, completion of the planned 100%. Forestry measures: water conservation forest to create 0.40 acres, 100% completed the program; roadside planting 2.75 km, 100% completed the program. Science and technology promotion measures: technical training 01,100 people to complete the project 100%; demonstration and extension of 0.03 acres, 100% completed the program. Work and other measures: the management costs 118,000 yuan, 135,100 yuan for the planned 87.34%; management and protection costs 38,600 yuan, 18,000 yuan expenditure during the year, the remaining funds under the management and protection sub-annual payment of the situation.

four cases

construction quality through self-examination, Xi County, 2007-2009 quality of the projects meet the design requirements, construction supervision system implemented, some works of quality, construction better quality. Specifically as:

1, hydraulic gate dam, irrigation and drainage stations, lining canals, reservoirs, river bank protection works management room and all the raw materials, concrete, mortar strength and mix all the design requirements, construction technology specifications; piping and reasonable depth of 1.2 m, in the frozen soil layer below, irrigation is guaranteed; transmission line model, equipment specifications and installation standards are in line with electrical engineering; medium-sized dam Big Three is complete, a small dam dam and spillway facilities, meet the dam-building standards.

2, agricultural engineering machine according to the terrain slope terracing projects built to grid fields of Sichuan,Discount UGG boots, Land Leveling; tractor road planning and reasonable road surface; improve the soil by deep plowing, fertilization and other measures, the soil content of a mechanism improved physical and chemical properties were improved.

3, forest site preparation pre-project standards high, high standard seedlings, mainly coniferous arborvitae, pine mainly native trees, forming a control, a standard, when effective.

4, science and technology promotion in three years, in various forms in the three project areas to carry out agricultural extension work, farmers and technical personnel were trained 03,300 people, demonstration and extension of new agricultural technology, new varieties of six, so that the project Agricultural transmittance varieties and advanced technology coverage was significantly higher than non-project area, project area farmers have significantly improved the quality of science and technology.

V.

project management and protection cases for three years, the transfer of timely completion of projects, management and protection measures to basically put in place, clear the property right,UGG shoes, clearly the management and protection of the main run, establish and improve the running pipe care system, management and protection agreement signed, the implementation of the Guanhuzeren. So basically the effective project management and protection, to ensure efficiency in the use of the play project.

VI-effectiveness

completed three years of comprehensive management of an area of 1.51 million mu of ecological, agricultural infrastructure to improve the condition of the county to promote the new rural construction, improve the ability to resist natural disasters, and enhance agricultural development potential, and promote rural economic development, increasing peasant income, plays a major role.

first improve the basic conditions for agricultural production. Project area electric pumping station, gate dam, reservoir, pipes and channels, dam, Hirata full implementation of site preparation and other projects, has greatly improved the agricultural infrastructure, improved fertility, and improve the ability of mechanized farming, the liberation of labor, improved food production, increase farmers income. Second is to highlight the diversity of ecological construction. Local conditions, to create a water conservation forest, forest and road protection forest, planting different tree species, one into the scene, results-oriented, play water conservation, soil and water, regulating climate, reducing the role of wind damage, disaster prevention and resilience significantly enhanced. Achieve ecological construction and farmer income, rural living environment and improve agricultural production conditions of organic binding, the project of forest coverage rate reached 48.5%, 85% degree of soil erosion. Third, adjust the industrial structure. Project area of agriculture, forestry, water, and the comprehensive implementation of technological measures, so that farmers break the traditional mode of agricultural production, to play the advantages of land resources, land utilization and improve profitability, ecological, social and economic benefits are substantial.

VII, data and document management file management

Xi County set up a room, counters, managed by hand, basically binding norms, access to convenient. Data files in accordance with the annual sub-project dossier,, by: provincial communications, project pre-information type of information the project implementation, supervision data, information on project completion, project management and protection of data, eight categories of institution building and image data.

eight, management and operation mechanism of the situation

(a) strengthen the leadership of the project implementation organizations to provide effective protection

do I set up the beginning of the County Farmers made to set up of the county as a leader, deputy head of the deputy governor in charge, the functional departments of the township township chiefs and members of the comprehensive agricultural development for the Leading Group, has overall responsibility for the organization of comprehensive agricultural development co-ordination arrangements. Group under the leadership of a specific project construction team, to deploy financial, development and reform, poverty alleviation, agriculture, transportation, water conservancy and other relevant departments and project leaders and technical staff involved in village level cadres to participate in, whether it is planning and design, project approval, financing, or propaganda, and project implementation, quality supervision are involved throughout, and the timely implementation of the project coordination of the process of solving contradictions and problems encountered, the formation of upper and lower linkage, the department's good work with the pattern for the project's implementation provides a powerful organizational guarantee.

(b) innovative mechanisms to ensure quality standards

construction to ensure construction quality standards, we have one at the project planning, adhere to high standard, many of the project area site investigation and repeated demonstration, local conditions, hilly plateau slope ditch Chuan, Tian Lin Road landscape master plan, scientific design, one-step, year by year the implementation of the advancing, done that is consistent with the wishes of farmers, but also reflect the project characteristics. Second, the implementation of the project, combined with practical and county project area topography features, in accordance with the , high standards of planning, large formation combat, mechanized operations, strict management, and built a bright spot in the county comprehensive agricultural development projects, excellent engineering. Third, the construction mechanism, strict implementation of project legal system, project bidding system, project supervision system, project publicity system, county reimbursement system, project management and protection system Project legal system is responsible for the first unit of top leaders, Engineering Command commander is directly responsible, the technical engineering and technical personnel responsible; project commissioned by the county government procurement bidding system is the center of more than 10 million single project in strict accordance with procedures open bidding; project supervision system is tracking by the supervision department supervision and project implementation, quality assurance engineering standards; project is the public announcement system on the project construction and use of the content and sources of funding and projects in the village public spaces before, during, after the publicity and accept their supervision; county capital reimbursement system is the progress of project implementation in line with the disbursement of funds, allocated strictly according to the procedure for approval to ensure the safe operation of the project funds; project management and protection system is the project is completed, in conjunction with the township where the project is responsible for a timely manner for the transfer procedures to the village committee, and signed the contract management and protection, ensure the long-term economic returns.

nine, problems and rectification

(a) problems

2007 year project: First, individual standards are not high dam, management and protection are not in place; Second, the tractor road standards are not high; third document classification is not standardized. Project 2008: The first channel of the standard is not high, and second, the survival rate is not high; Third, the information is not perfect; 2009 project: First, management and protection fees, management fees, technology promotion fee bill is not perfect. The second is endless tractor road ditch, arch standard is not high. Third, the supervision of the data specification. Fourth, the lack of archives.

(b) the rectification of

2007 year project, completed the dam, tractor road repair and meet the design standards; enhanced management and protection measures; standardized file management. 2008 project, conducted in autumn 2009 Planting monthly replanting, improve the information and engineering to improve the standard. 2009 projects, improve the bill, the Commissioner of standardized data, filled the missing information.

review the work of three years, the county agricultural development as a agricultural efficiency and rural incomes made an example, have achieved some results, but also there are many problems in the future work, in accordance with the scientific development concept, the engineering quality, construction, improved mechanisms, continue to strengthen the implementation of various systems, while improving the overall quality, in future work to solve problems and improve to meet the agricultural development of the new situation.

X. Conclusion

acceptance by our self-examination self-examination, that the county county, the Government attaches great importance to, 2007 - 2009 comprehensive agricultural development projects to meet the design requirements, the overall project schedule complete, high quality of the project, all project funds in place, file information is complete, well completed the plans approved at higher levels, acceptance.

2007 year project acceptance Leader: Yang Xiaoping

Acceptance: The Qin Xiaoming He Jindong GUANG Jia Hongbing

2008 year project acceptance Leader: Yang Xiaoping

acceptance Officer: Zhuo Ying Qin Xiaoming Jia Hongbing He Jindong GUANG

2009 年 acceptance Leader: Yang Xiaoping

Acceptance: The Qin Xiaoming GUANG Zhuo Ying Lin Haiping Jia Hongbing

Annex: 1,2007 Land management in homeland investment project task completion table

2,2008 Jia Yu Wei River on the task of land management projects Investment in table

3,2009 Dongchuan River on the task of land management projects Form of Investment in Watershed 4,2007 homeland effective land management projects Wei Biao

5,2008 Extinguishing of Land Management project benefits Biao

6,2009 watershed land management projects in Dongchuan Benefit Table

Xi County Comprehensive Agricultural Development Office

b O a O on September 5